Sản phẩm

Danh mục

Rơ le bảo vệ MiCOM Agile P747 - GE Centralized Busbar Differential Relay

Hotline : 0976 33 55 58

Centralized Busbar Differential Relay

The MiCOM Agile P747 provides complete protection for voltage levels up to extra high voltage busbar configurations with a centralized 3-box architecture. The MiCOM Agile P747 can accommodate up to 4 zones plus check zone and protect up to 18 terminals. The MiCOM Agile P747 Is particularly useful in double busbar with double bus coupler applications and allows a high number of opto inputs, relay outputs, and virtual inputs and outputs to manage the complete substation scheme.

The MiCOM Agile P747 also incorporates enhanced circuit breaker failure logic with additional protection functions such as dead zone and overcurrent. In addition, the MiCOM Agile P747 provides a wide range of measurement, monitoring, post fault analysis and self-diagnostic features. Powerful programmable scheme logic, trip circuit supervision, fully customizable menu texts, multi-level password protection, on-line measurements and plant status monitoring are all included. MiCOM Agile P747 employs an innovative external fault detection algorithm to ensure stability when CTs become saturated.

Key benefits:

  • Tripping time is independent of substation topology and number of feeders
  • User-friendly software tools for scheme monitoring
  • Built-in CT saturation proof breaker failure protection
  • Harsh environment protection extends the life of the product
  • No internal batteries in GE-branded models – removes a maintenance item and eases air-freight logistics
  • Advanced binary inputs comply with the harshest norms for surge withstand, plus the ESI 48-4 EB2 standard. Spurious wiring pickup is eliminated without the use of interposing relays, external resistors or time delays. Battery/wiring faults, switching noise, and induction from long parallel circuits are tolerated without mis-operation

Thông báo ! Tài liệu của sản phẩm này hiện đang được cập nhật.

Danh mục


Đối tác